The Journey to the Holy Grail is the story of how Solnyxus rebuilt everything under its clients' websites in about ten days. We left a cloud that fought us and outgrew one small server. We baked our own golden images, built two pools of servers in two regions, and moved every site twice. It ended with a failover in 35 minutes, and the whole journey came full circle, back home to Hillsboro, Oregon, where it started.
It's written for anyone who's wondered what "managed hosting" really means behind the curtain, and for us, so the next time we do this we start from what worked.
Read the series
Part 1: Square Zero (opens in a new tab)
Where we ended up. Two pools named Holy Grail and Camelot, servers on Ubuntu 26.04, Python 3.14 and Postgres 18, and a move that takes one signature and about eight minutes. Meet the four sites that made the trip.
Part 2: Leaving Google, Finding OVH (opens in a new tab)
One server doing too much, a cloud that presented too many obstacles, and an OVH quota that pushed us east to Virginia. Plus how our servers got their Monty Python names.
Part 3: The Golden Image Saga (opens in a new tab)
Baking servers we can trust. One line of Go that bought eight identical servers, a mirror that answered 503 at midnight, and stand-ups that wouldn't check in.
Part 4: Camelot (opens in a new tab)
The first pool, and the first moves. An OpenSSH surprise, the decision to stay on Python 3.14, a missing systemd unit that took our own test site down, and the upgrade from Postgres 16 to 18.
Part 5: The Late-Night Tickets (opens in a new tab)
A certificate for the wrong domain, a rollback that undid too much, a CNAME Cloudflare wouldn't overwrite, and two copies of one site with two workers. Every ticket became a step.
Part 6: The Holy Grail (opens in a new tab)
Why moves took 25 minutes, what the speed-up broke, and the 35-minute failover that brought every site home to Hillsboro.
The journey in numbers
- About 10 days, from retiring Google Cloud on October 24 to square zero on November 1.
- About 180 Hub releases.
- Nearly 70 signed change orders, with fifteen failed or withdrawn along the way.
- A dozen golden image builds, and eight servers we didn't mean to buy.
- 4 sites moved twice, 35 minutes for the final failover, about 4 minutes down per site.
What's next
The next chapter is quieter on purpose. Every machine stays on the latest of everything, sign-ups are open, and a warm standby is copied continuously so a failover is a switch, not a move. When it's ready, it'll get its own story.
See every part on one page: the series page (opens in a new tab). Or start at the beginning: Part 1, Square Zero (opens in a new tab).
Cloud
More like this
Cloud
Build a Tiny JSON API With Axum: Rust on the Web in Fifteen Minutes
Your Rust programs have been talking to the terminal. Time they talked to the internet. Build a notes API with Axum, with routes, JSON in and out, shared state and proper 404s, in about 50 lines.
Cloud
Ollama Review: Running Local LLMs on Your Own Machine, No Cloud Required
What if your AI assistant lived in your basement instead of someone else's data centre? A review of Ollama: how to run local LLMs with it, what hardware you really need, the API that makes it useful, and where it falls short.
Cloud
Async Rust With Tokio: Build an Echo Server That Juggles a Thousand Clients
One waiter, forty tables, and nobody waits for their soup. That's async. Learn async Rust with Tokio by building a 30-line TCP echo server, then meet the one mistake that freezes the whole restaurant.