Moves took 25 minutes because the Hub only looked once a minute. We made it look every five seconds, broke a check that had been relying on the slowness, fixed that too, and failed every site over to Holy Grail in 35 minutes.

Watcher

4 min read

The Holy Grail, we have landed

Part 6 of The Journey to the Holy Grail (opens in a new tab). Previously: The Late-Night Tickets (opens in a new tab).

By midnight on Saturday, every site was on Camelot (opens in a new tab). Holy Grail, the same pair of servers in Oregon, built from the same golden images (opens in a new tab), sat waiting. The plan was to fail every site over to it, so that Holy Grail serves and Camelot becomes the standby.

Before we did that, Charles asked the question every client would ask: why is this taking so long?

Why a move took 25 minutes

It wasn't DNS. Cloudflare switches an address in seconds, and the site answered on the very first try after each switch. It was us.

The Hub advanced a move once a minute. Every step that ran something on a server took at least two of those minutes: one to send the command and one to read the result. Even a step that finished in two seconds waited for the clock. Alpha's move took 26 minutes, ten of them with the site down, for maybe eight minutes of real work.

The fix was mostly about paying attention more often:

  • Moves now advance every five seconds instead of every sixty.
  • A run sheet starts its next step within seconds of the last one finishing.
  • The second copy of a site's uploads, made while the site is quiet, is skipped when nothing has changed since the first.

What the speed-up broke

The first attempt at the failover (CHG-170) failed three times, on the same line each time:

its health page answered HTTP 502 Bad Gateway

The check that a site answers after its switch allowed five tries. At a minute apart, that had been five generous minutes. At five seconds apart, it was 25 seconds. And a Vexorus copy that has just restarted against its moved database answers 502 for about two minutes while it warms up.

The old slowness had been hiding that all along. Speeding up revealed it.

So the health check, the login check and the site check now each wait up to three minutes from their first miss. They ask every round, and fail only when the three minutes are up. A copy that reports "degraded" with HTTP 200 counts as answering: a warm copy runs no background worker until its cutover, and it's honest about it.

A failover in 35 minutes

Release .253 went live at 04:15 UTC on Sunday, and the failover resumed:

SiteMoved (UTC)TookDown
Canary (ours)04:15 → 04:227 min~4 min
Tiny Tim's Palace (test)04:22 → 04:319 min~4 min
The Alpha Power Wash04:31 → 04:41~10 min~4 min
The Buckeye Belle Signings04:41 → 04:50~9 min~4 min

The first two restarted copies answered 502 for about two minutes each, and the new wait rode straight through it. Every site got its own certificate on the new server. Every database went from Postgres 18 to Postgres 18. Every login answered 200. At 04:50 the run sheet reported success, and Camelot quietly became the standby.

Full circle

Here's the part that still makes us smile.

This whole journey started on one small box in OVH's Hillsboro, Oregon region. Hillsboro's quota pushed us out to Virginia, to a hand-built pair, and then to Camelot. And Holy Grail, the pool every client site now runs on, sits in Hillsboro, Oregon: right back where we started.

Same region. Very different place. Now there are two pools in two regions, golden images on both, Ubuntu 26.04, Python 3.14 and Postgres 18 underneath, and a move that takes one signature and about eight minutes. The run sheet that did it is written up in our knowledge base, so the next one starts from what worked rather than from memory.

Square zero

We didn't get here by planning it all right. We got here by writing down every way it went wrong, fixing each one in the code, and doing it again: fifteen failed or withdrawn orders, a dozen golden builds, eight accidental servers and one very long Sunday.

That's why we call this square zero. Not the end of the work, but the first time the foundation stands on its own.

Next comes the boring part we're most excited about: every machine on the latest of everything, sign-ups open to new businesses, and, if we've done our jobs, nothing to fail over from for a long while.